Tamworth Athletics Centre

Tamworth Athletics Centre _0000_StraightTamworth Athletics Centre _0000_Straight
Tamworth Athletics Centre _0003_Photo 13-6-19 08 17 33Tamworth Athletics Centre _0003_Photo 13-6-19 08 17 33
Tamworth Athletics Centre _0004_Photo 13-6-19 08 15 55Tamworth Athletics Centre _0004_Photo 13-6-19 08 15 55
Tamworth Athletics Centre _0005_Photo 13-6-19 08 15 21Tamworth Athletics Centre _0005_Photo 13-6-19 08 15 21
Tamworth Athletics Centre _0007_Photo 13-6-19 08 14 27Tamworth Athletics Centre _0007_Photo 13-6-19 08 14 27
Tamworth Athletics Centre _0006_Photo 13-6-19 08 15 02 (1)Tamworth Athletics Centre _0006_Photo 13-6-19 08 15 02 (1)
Tamworth Athletics Centre _0002_Photo 13-6-19 08 19 34Tamworth Athletics Centre _0002_Photo 13-6-19 08 19 34
Tamworth Athletics Centre _0001_Photo 13-6-19 08 19 42Tamworth Athletics Centre _0001_Photo 13-6-19 08 19 42
Tamworth Athletics Centre _0011_Line MarkingTamworth Athletics Centre _0011_Line Marking
Tamworth Athletics Centre _0009_Photo 13-6-19 08 13 44Tamworth Athletics Centre _0009_Photo 13-6-19 08 13 44
Tamworth Athletics Centre _0010_Photo 13-6-19 08 07 53Tamworth Athletics Centre _0010_Photo 13-6-19 08 07 53
Tamworth Athletics Centre _0012_DJI_0245Tamworth Athletics Centre _0012_DJI_0245
Tamworth Athletics Centre _0013_BeforeTamworth Athletics Centre _0013_Before
Tamworth Athletics Centre _0014_Before 2 - Bend ready for base layerTamworth Athletics Centre _0014_Before 2 - Bend ready for base layer
icon_design-85x85

Project Name:

Tamworth Athletics Centre

icon_site_location-85x85

Location:

Hillvue, NSW

icon_signoff-85x85

Completion Date:

June 2019

Polytan_Icons-05

Client:

DAVID PAYNE CONSTRUCTIONS

Polytan_Icons-07

Sport / Application

Athletics

Polytan_Icons-09

Product / System Used:

Rekortan M (formerly Spurtan BV)

Project Overview:

Tamworth Council had a vision to expand their outstanding sports precinct with a new velodrome and 400m synthetic athletics track. Polytan was engaged as a sub-contractor by David Payne Construction and worked closely with their team to deliver the IAAF Class 2 Facility.

The project included:

• Regular meetings with the civil contractor to ensure there was a clear understanding of any tolerances relating to the asphalt placement to ensure conformance with the strict guidelines.
• Installation of the internal Hauraton drainage system and supply and install of in-ground equipment for jumps and throw facilities to ensure IAAF Class 2 compliance.
• 8 lane track installation with 10 lane main straight using Rekortan M (formerly Spurtan BV), complete with line-markings to meet World Athletics, Little Athletics and Masters compliance.

The Results:

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Pretium aenean pharetra magna ac placerat vestibulum lectus. Sit amet tellus cras adipiscing enim eu turpis egestas. Nisi est sit amet facilisis magna etiam tempor orci eu. Dolor magna eget est lorem ipsum. Cursus vitae congue mauris rhoncus aenean vel elit.